Valtioneuvoston asetus jakeluvelvoitteen joustomekanismista
Purpose
The decree sets out which alternative mitigation actions (e.g. phasing out oil heating, afforestation) fuel distributors use to meet part of their distribution obligation, along with application, reserve and verification requirements.
Analysis
The flexibility mechanism lowers the cost of the distribution obligation, but each action needs a baseline scenario, additionality analysis, leakage estimate, an ISO 17029 accredited verifier on site (section 13) and 20% (land use) or 10% of mitigation results placed in a reserve for five years (section 7). Cost: about 30 projects x (50,000 EUR application + 20,000 EUR verification) = 2.1M EUR/yr. Fix: standard baselines and calculation formulas for typical actions such as oil boiler replacement, and remote verification for small actions. Savings: about 1M EUR/yr.