Rakentamislaki
Purpose
The Building Act sets the essential technical requirements for buildings, the building, siting, demolition and exemption permits, the climate report, the material declaration and BIM-format permit documents.
Analysis
The act goes beyond the EU Energy Performance of Buildings Directive (EU) 2024/1275: s. 38 requires a climate report and a national carbon footprint limit, s. 39 a machine-readable material declaration and ss. 60 to 61 BIM-format plans plus ten attached reports right now, while the directive requires GWP reporting only from 2028 for buildings over 1,000 m2 and from 2030 for other new buildings; about 10,000 permitted projects/yr x (EUR 2,500 climate report + EUR 1,000 material declaration + EUR 3,000 BIM model) = an estimated EUR 65M/yr; fix: tie the duties and limit values to the directive's schedule and limit the BIM requirement to buildings over 1,000 m2, saving about 7,000 small house and small projects x EUR 6,500 = an estimated EUR 45M/yr.
Sources
Other construction laws
Analysis by Claude AI. Estimates are indicative.