Valtioneuvoston asetus jätteistä
Purpose
The Waste Decree regulates waste classification, packaging, separate collection, sorting of construction and demolition waste, waste record-keeping, transfer documents and waste management register applications.
Analysis
The decree tightens the EU Waste Framework Directive: section 21 obliges every business property in built-up areas to separately collect biowaste from 10 kg per week, cardboard and plastic packaging from 5 kg, and glass and metal from 2 kg, and section 26 requires 11 separate construction waste fractions on site while Article 11 of the directive requires six (wood, minerals, metal, glass, plastic, gypsum); cost: about 50,000 small business properties x 2 extra fractions x 250 EUR/yr = 25 MEUR and 10,000 sites x 5 extra fractions x 300 EUR = 15 MEUR; fix: raise the section 21 thresholds to 50 kg (bio) and 20 kg (packaging), limit section 26 to the directive's six fractions and allow post-sorting at the facility; savings about 12.5 MEUR + 7.5 MEUR = 20 MEUR/yr.
Sources
Other environment laws
Analysis by Claude AI. Estimates are indicative.