  1. Enacted 24 Oct 2025

    ⚠ SIMPLIFY941/2025

    The Act regulates regular dialogue, a workplace development plan and staff representation between employers of the Evangelical Lutheran Church with at least 20 staff and their personnel.

    The Act requires a dialogue meeting every quarter (twice a year for employers under 30 staff) and a written development plan, while parishes are shrinking with falling membership and need to adjust quickly. Cost: about 200 employers x 4 meetings x 6 people x 2 h x 45 euros = 432,000 euros plus development plans 200 x 2 working days x 400 euros = 160,000 euros, about 592,000 euros a year in total. Fix: statutory dialogue once a year unless the staff representative asks for more, and development plans only for employers with over 50 staff. Savings: 200 x 3 meetings x 540 euros = 324,000 euros plus about 120 small employers x 800 euros = 96,000 euros, about 420,000 euros a year.

    Cost of the regulation~€592k/yrEstimated saving if simplified~€420k/yr
  2. Enacted 23 Oct 2025

    ⚠ SIMPLIFY935/2025

    The decree sets the areas, offices and departments of the ten regional vitality centres, the cross-regional division of tasks between them, and the duties and reporting obligations of the Employment, Development and Administration Centre.

    Sections 3 to 13 split the same tasks into a patchwork: road contract tendering is handled region by region by the Southwest, Southeast, Central and Lapland centres (sections 4, 6, 8 and 12), fisheries supervision by Southwest, East and Lapland (sections 4, 7 and 12), and structural fund intermediate body tasks by four centres whose split the ministry decides separately (section 13), while the administration centre produces on employment services an annual target follow-up, an annual expert assessment, a biennial equality report and a per-government-term summary (sections 23 to 26); coordination and performance agreements 10 centres x 2 FTE x 70,000 € = 1.4 M€ and overlapping reports 5 FTE x 70,000 € = 0.35 M€, total an estimated 1.75 M€/yr; fix: assign each nationwide task to one centre and merge the reports in sections 23 to 26 into one annual report; savings an estimated 0.7 M€/yr.

    Cost of the regulation~€1.8M/yrEstimated saving if simplified~€700k/yr
  3. Enacted 17 Oct 2025

  4. Enacted 9 Oct 2025

  5. Enacted 9 Oct 2025

  6. Enacted 3 Oct 2025

    ✓ KEEP918/2025

    The decree sets the calculation rules for vocational education funding, including student-year counting, entry-level and cost-group weights, and multipliers for intensive special support and accommodation.

    The formula distributes an existing appropriation based on student data providers already record, with no separate reporting, and weights (0.52 for a grade average of 9-10, 3.03 for 5-5.99) steer money to the weakest starters; it is complex (6 grade bands, 7 cost groups) but does not block growth.

  7. Enacted 2 Oct 2025

  8. Enacted 2 Oct 2025

  9. Enacted 25 Sep 2025

  10. Enacted 25 Sep 2025

  11. Enacted 25 Sep 2025

  12. Enacted 25 Sep 2025

  13. Enacted 22 Sep 2025

    ✓ KEEP888/2025

    The decree sets the conditions under which day surgery and light procedures requiring anaesthesia are allowed in the hospitals of Kemi, Oulainen, Salo, Savonlinna and Valkeakoski and in HUS hospitals without round-the-clock emergency care.

    Relaxes the centralisation under section 45 of the Health Care Act, also allows private providers through procurement, and limits the conditions to patient safety, such as discharge by the next morning at the latest.

  14. Enacted 11 Sep 2025

  15. Enacted 10 Sep 2025

    ⚠ SIMPLIFY880/2025

    The decree lists 28 vocational qualifications or competence areas whose provision the Ministry of Education and Culture is allowed to restrict in the provider licences granted in the vocational education steering pilot.

    Besides fields with heavy safety and equipment requirements (aircraft technology, mining, forestry and earthmoving machinery), the list covers music, dance and sports qualifications, where the restriction shields current providers from new entrants: an estimated 3,000 students x €10,000 = €30M/yr of funding in the closed fields; drop the 9 music, dance, sports and mobile library entries from the list, and an estimated 5% efficiency gain from competition saves €1.5M/yr.

    Cost of the regulation = estimated saving (the whole cost would go)~€1.5M/yr
  16. Enacted 28 Aug 2025

  17. Enacted 1 Aug 2025

  18. Enacted 31 Jul 2025

  19. Enacted 10 Jul 2025

  20. Enacted 10 Jul 2025

  21. Enacted 27 Jun 2025

    ⚠ SIMPLIFY823/2025

    The Act governs how the Permit and Supervision Agency handles environmental and water permits, including electronic filing, joint processing of permits, priority for green transition projects and coordination with Tukes permits.

    The Act speeds up handling through joint processing (section 9) and a one-stop contact point (section 14), but the 12-month deadline and priority in section 7 apply only to listed sectors such as renewables, hydrogen, batteries, data centres and nuclear power, so other industry queues behind them with no deadline, and coordination under section 16 covers only mining and chemical permits, not the municipal building permit; cost approx. 800 other projects x 4 months of extra delay x EUR 6,250 a month in capital and waiting cost = EUR 20M a year; fix: a 12-month maximum handling time for all environmental and water permits and coordination with the building permit under the Construction Act as well; savings approx. 800 x 2 months x EUR 6,250 = EUR 10M a year.

    Cost of the regulation~€20M/yrEstimated saving if simplified~€10M/yr
  22. Enacted 27 Jun 2025

  23. Enacted 27 Jun 2025

    ⚠ SIMPLIFY531/2025

    The act replaces the ELY Centres and the KEHA Centre with regional vitality centres and an Employment, Development and Administration Centre, which handle regional development, business, agriculture, transport, immigration and environmental tasks.

    Sections 6 and 7 subject the centres to sector steering by five ministries plus a joint strategy document and a separate performance agreement for each centre: an estimated 10 centres x 5 ministries x 0.3 FTE x €75,000 = €1,125,000/yr of steering work; replace the separate performance agreements with a single agreement led by the Ministry of Economic Affairs and Employment with centre-specific annexes, saving an estimated €550,000/yr.

    Cost of the regulation~€1.1M/yrEstimated saving if simplified~€550k/yr
  24. Enacted 27 Jun 2025

    ✓ KEEP530/2025

    The act establishes the national Permit and Supervision Agency, which handles permits and supervision for social and health care, education, the environment, occupational safety, and rescue services and preparedness in dedicated departments.

    Brings the tasks of the regional state administrative agencies, Valvira and environmental permitting into one national agency, which removes region-by-region differences in permit practice and cuts the number of permit authorities.

  25. Enacted 4 Jul 2025

  26. Enacted 4 Jul 2025

    ⚠ SIMPLIFY511/2025

    The act creates the Arts and Culture Agency by merging the Arts Promotion Centre and the National Audiovisual Institute, and sets up an arts and culture council and four boards.

    Abolishing the national and regional arts councils is good, but section 5 keeps three separate grant and state-subsidy boards alongside the council: 3 boards x 9 members x 6 meetings/yr x €400 = €64,800 plus preparation 3 x 0.5 FTE x €65,000 = €97,500, about €160,000/yr in total; move the grant decisions to peer-review sections of the council, saving an estimated €100,000/yr.

    Cost of the regulation~€160k/yrEstimated saving if simplified~€100k/yr
  27. Enacted 4 Jul 2025

    ⚠ SIMPLIFY510/2025

    The act sets out the Finnish Heritage Agency's tasks, merges the Governing Body of Suomenlinna into it and allows entrance fees and building rents to be set below market price.

    Section 7(2) lets rents for culturally valuable buildings be set below market or waived entirely, which distorts competition with private landlords: an estimated 20,000 m² of commercial and event space x €3/m²/month discount x 12 = €720,000/yr in hidden subsidy; require market rent and grant any needed support as a transparent budget appropriation, saving an estimated €400,000/yr.

    Cost of the regulation~€720k/yrEstimated saving if simplified~€400k/yr
  28. Enacted 4 Jul 2025

  29. Enacted 4 Jul 2025

    ⚠ SIMPLIFY508/2025

    The act sets out the Finnish National Agency for Education's tasks, merges the Institute for the Languages of Finland into it as a department, and establishes a board and six language boards.

    Merging the agencies is the right direction, but the six separate language boards in section 6 (Finnish, Swedish, Sámi, sign languages, Romani, Karelian) only issue general recommendations: 6 boards x 8 members x 4 meetings/yr x €400 = €76,800 plus secretariat 6 x 0.2 FTE x €70,000 = €84,000, about €160,000/yr in total; merge them into one language board with language sections, saving an estimated €100,000/yr.

    Cost of the regulation~€160k/yrEstimated saving if simplified~€100k/yr
  30. Enacted 4 Jul 2025

    ⚠ SIMPLIFY507/2025

    The act brings the six agencies under the Ministry of Education and Culture into a common education and culture administration and regulates their management, qualification requirements and preparedness.

    Section 7 requires a separate preparedness manager in each of the six agencies, including the small student financial aid appeal board, and section 4 requires a master's degree from every official exercising significant public authority. Cost: about 6 x 0.5 FTE x 80,000 EUR = 240,000 EUR/yr for preparedness roles. Fix: one shared preparedness manager for the whole branch via the common services in section 2, and replacing the degree requirement with a competence requirement. Savings: about 200,000 EUR/yr.

    Cost of the regulation~€240k/yrEstimated saving if simplified~€200k/yr