  1. Enacted 30 Jul 2015

  2. Enacted 21 Jul 2015

    ✓ KEEP864/2015

    Salmon fishing restriction in the Baltic Sea.

    The decree prohibited salmon fishing by fishing vessels registered in Finland in Baltic Sea ICES subdivisions 22-31 from 24 July 2015, and catches taken earlier could be landed until 23 July. The ban resulted from the EU fishing quota being exhausted and was in force only until the end of that year. A temporary quota-based suspension is not a lasting barrier to growth.

  3. Enacted 1 Jul 2015

    ✓ KEEP854/2015

    Interior Ministry decree regulates the application procedure, amount (€200–1,500 by country group), and payment of voluntary return assistance for third-country nationals returning to their home countries.

    Voluntary return is far cheaper than forced deportation (deportation costs €3,000–10,000 per person; this assistance caps at €1,500). The procedure is straightforward: written application, police statement, payment. The coordination group (§9) is a lightweight structure with no separate compensation. No impact on competition or business entry.

  4. Enacted 26 Jun 2015

    ✓ KEEP822/2015

    Ratification of an international treaty.

    The act brings into force the provisions within the scope of legislation of the Doha amendments of 2012 to the Kyoto Protocol to the UN Framework Convention on Climate Change. The amendments concerned the second commitment period of the protocol and the emission reduction commitments of states. The actual obligations for businesses come from EU emissions trading and other rules, so this implementing act is not in itself a barrier to growth.

  5. Enacted 26 Jun 2015

  6. Enacted 25 Jun 2015

    ✓ KEEP819/2015

    The decree regulates licensing, supervision, and safety procedures for the manufacture, storage, trade, possession, and disposal of explosives.

    Explosives are inherently extremely dangerous materials where licensing and supervision are essential for public safety, counter-terrorism, and accident prevention - the regulatory burden is proportionate to the risk level and implements EU directives (2014/28/EU on explosives, 2013/29/EU on pyrotechnics) consistently.

  7. Enacted 26 Jun 2015

    ⚠ SIMPLIFY817/2015

    The act regulates the licensing, title protection, registration, and supervision of social welfare professionals (social workers, bachelors of social services, gerontologists) through Valvira.

    Client safety requires verifying professional competence, but the law creates three growth barriers: (1) Recognition of qualifications from non-EU/EEA countries is slow and burdensome with adaptation periods and aptitude tests, hindering resolution of chronic workforce shortages (estimated 3,000–5,000 unfilled social worker positions). (2) Temporary practice as a social worker requires advanced-stage master's students to have completed specific courses and training, unnecessarily limiting the substitute pool. (3) Valvira's central register and licensing process were built separately from the healthcare system without a shared digital platform. Simplification: Set a maximum 90-day processing time for third-country qualification recognition, grant automatic temporary practice rights under supervision during processing, and expand social worker substitute eligibility to master's students after bachelor's completion.

    Cost of the regulation~€8M/yrEstimated saving if simplified~€3M/yr
  8. Enacted 25 Jun 2015

    ✕ REPEAL794/2015

    The decree regulates the personalization process for competence-based qualifications in adult education: application phase, recognition of prior learning, planning of qualification demonstrations, and preparation of personalization documents.

    The decree is based on the repealed Act on Vocational Adult Education (631/1998) and references abolished examination committees. The 2018 vocational education reform (Act 531/2017) replaced the entire system. The structures required by this decree (examination committees, separate competence-based qualifications) no longer exist. The decree is effectively dead letter and should be formally repealed to eliminate legal confusion.

  9. Enacted 25 Jun 2015

  10. Enacted 18 Jun 2015

    ✓ KEEP783/2015

    Ministry decree implementing national details of the EU Animal By-Products Regulation (EC) No 1069/2009 and its implementing regulation (EU) No 142/2011, covering use of animal by-products for feeding, disposal in remote areas, and processing requirements.

    The decree implements mandatory national supplements explicitly delegated by the EU Animal By-Products Regulation (remote area disposal derogations, fur animal feeding requirements, freshwater fish use) and does not create regulation beyond what EU law requires.

  11. Enacted 17 Jun 2015

    ⚠ SIMPLIFY771/2015

    The decree establishes an Advisory Board for Ethnic Relations (up to 38 members + deputies) and seven regional advisory boards (each 12–16 members + deputies) to promote dialogue between immigrants, ethnic minorities, and authorities.

    The structure is oversized: the national board has up to 38 members + 38 personal deputies (76 people), seven regional boards have 70–112 members + deputies (140–224), plus full-time secretary-general, secretary, and regional secretaries. Approximately 220–300 people in an advisory structure with no decision-making power – it issues opinions and proposals. Seven regional boards can be replaced by one national body with digital consultations. The national board can be halved from 38 to 15 members. Cost: full-time secretary-general + secretary (~€120,000/yr), regional secretaries (~7 × €50,000 = €350,000/yr), meeting fees and travel ~€150,000/yr, totaling ~€620,000/yr. Abolishing regional boards and downsizing will save ~€400,000/yr.

    Cost of the regulation~€620k/yrEstimated saving if simplified~€400k/yr
  12. Enacted 11 Jun 2015

  13. Enacted 12 Jun 2015

    ⚠ SIMPLIFY763/2015

    The Shooting Range Act regulates the establishment, maintenance, and supervision of shooting ranges, requiring a permit or notification from the National Police Board.

    The basic structure (permit for large ranges, notification for small ones) is sound, but the process is bottlenecked at the National Police Board. All permits go through Poliisihallitus, which must also request local police opinions (§5) and inspect sport shooting centers (§11). Even small ranges (≤10,000 shots/year) require a two-month advance notification (§8). Additionally, a separate environmental permit is required (§12 referencing Environmental Protection Act §27), creating dual parallel permit processes. Simplification: 1) Delegate small range notifications to local police and cut the advance period from 2 months to 2 weeks (saving applicants approx. 500 ranges × €1,000 delay cost = €500,000/year). 2) Create a one-stop-shop combining the shooting range permit and environmental permit into one process (saving approx. €200,000/year in admin costs). 3) Raise the small range threshold from 10,000 to 25,000 shots/year so more recreational ranges qualify for the lighter notification procedure.

    Cost of the regulation~€1.5M/yrEstimated saving if simplified~€700k/yr
  14. Enacted 12 Jun 2015

    ⚠ SIMPLIFY759/2015

    The law sets conditions under which the state co-finances production support for electricity from specified wind farms (16 turbines, 48 MW) built in Åland over 12 years.

    The law creates a special financing mechanism for three named wind farm projects in Åland – preferential treatment not available to other wind power operators in Finland. Åland's co-financing is €500,000/turbine/year (max €8M/yr), but the state's net production support cost is estimated at €5–10M/yr for 12 years. The wind farms had to be commercially operational before 1 January 2020, and the law's entry into force requires a separate government decree. If the projects were never realized within the deadline, the law is a dead letter. Simplification: verify whether the law was ever activated; if not, repeal as unnecessary.

    Cost of the regulation = estimated saving (the whole cost would go)~€500k/yr
  15. Enacted 11 Jun 2015

    ✓ KEEP713/2015

    The decree regulates the supervision of non-productive investment compensations and genetic resource conservation agreements, and the consequences for non-compliance, under Finland's Rural Development Programme 2014–2020.

    The decree implements mandatory EU control regulation requirements (809/2014, 640/2014, 1306/2013) at the national level – without it, EU co-funded payments will not be disbursed; it adds no extra national regulation beyond EU requirements and the 2014–2020 programme period is ending.

  16. Enacted 11 Jun 2015

    ✓ KEEP712/2015

    Government decree regulating the control procedures for EU-funded area-based agricultural subsidies: measurement instruments, tolerances, ineligible areas, parcel boundaries, and sanctions.

    The decree directly implements the control system required by EU regulations (1306/2013, 1307/2013, 1305/2013, delegated regulation 640/2014), which member states must enforce as a condition for receiving EU agricultural subsidies - without it Finland will lose EU farm payment funding.

  17. Enacted 27 May 2015

    ✓ KEEP695/2015

    Approved unit costs for agricultural construction investments.

    The decree sets the eligible unit costs used when granting investment aid for construction investments in agriculture, reindeer husbandry and rural livelihoods. Fixed unit costs determine the maximum basis of the aid, for example for production buildings. They simplify the processing of aid applications and do not prevent investment, so the decree is not a barrier to growth.

  18. Enacted 21 May 2015

  19. Enacted 21 May 2015

    ✓ KEEP685/2015

    Government decree implementing the EU Seveso III Directive (2012/18/EU), regulating the permit, notification and supervision procedures for industrial handling and storage of hazardous chemicals.

    The decree implements EU Seveso III Directive (2012/18/EU) requirements into national law: threshold values, safety reports, major-accident prevention policies and inspection regimes correspond to directive minimum requirements. The tiered system (minor/major, notification/permit) is proportionate to risk. Safety oversight for chemical industry is essential for protecting human life and the environment, and the decree does not contain significant over-regulation beyond EU requirements.

  20. Enacted 22 May 2015

    ✓ KEEP684/2015

    The law regulates asbestos demolition work licensing, worker competency requirements, and related registries.

    Asbestos demolition is genuinely hazardous work where licensing is justified. The permit is granted within 14 days, is nationwide, and can be indefinite. Exemptions for short-term maintenance and encapsulation prevent over-regulation. EEA qualifications are recognized. The licensing system is lean and proportionate.

    Cost of the regulation~€200k/yr
  21. Enacted 22 May 2015

    ✓ KEEP681/2015

    Ratification of an international treaty.

    The act brings into force the provisions within the scope of legislation of the agreement amending the 1934 Nordic convention on inheritance, wills and estate administration. The amendments reconcile the Nordic convention with the EU Succession Regulation. Clear rules make cross-border estate administration easier and do not burden businesses, so the act is not a barrier to growth.

  22. Enacted 22 May 2015

  23. Enacted 22 May 2015

    ✓ KEEP657/2015

    The law regulates the preparation, administration, funding, supervision and audit of EU European Neighbourhood Instrument (ENI) co-financed cross-border cooperation programmes (in practice Finland-Russia CBC programmes).

    The law implements EU ENI Regulation (232/2014) and its implementing regulation (897/2014) nationally – the structures (managing authority, audit authority, monitoring committee) are mandated by EU law. The programmes are effectively frozen due to Russia's war of aggression, but the law itself creates no excess regulatory burden and does not restrict market entry. Cost is effectively €0 as long as no programmes are active.

  24. Enacted 22 May 2015

    ✓ KEEP638/2015

    Decree repealing a previous regulation.

    The act repeals, as of 1 June 2015, the 2010 act that had amended sections 46 and 47 of the Customs Act. The repeal was linked to the overall reform of customs legislation, in which the provisions of the old Customs Act were replaced. The act itself imposes no obligations on businesses or customs clients, so it is not a barrier to growth.

  25. Enacted 22 May 2015

    ✓ KEEP623/2015

    The law regulates Finnish Customs' powers in preventing, detecting, investigating and prosecuting customs offences, including intelligence gathering and covert coercive measures.

    This is an essential law enforcement statute granting Customs crime investigation powers (covert intelligence, undercover operations, controlled deliveries, telecommunications interception) parallel to police legislation - it does not restrict legitimate business activity but combats smuggling and economic crime.

  26. Enacted 22 May 2015

    ✓ KEEP609/2015

    The Climate Act (609/2015) establishes a framework for Finland's climate policy planning: long-term and medium-term plans, an adaptation plan, a Finnish Climate Change Panel, and reporting to Parliament, targeting 80% emission reduction by 2050.

    This is a framework law implementing EU obligations and international climate agreements. It does not create licensing barriers or market entry restrictions. The Climate Change Panel is a reasonably sized expert body, not bloated bureaucracy. The law explicitly requires cost-effectiveness (§6(5)) and consideration of economic factors. Food security protection for agricultural production is built in (§6(6)).

    Cost of the regulation~€500k/yr
  27. Enacted 13 May 2015

  28. Enacted 13 May 2015

    ✓ KEEP598/2015

    The decree sets qualification requirements and training obligations for shelter home staff working with victims of domestic violence.

    Shelter services are publicly funded crisis services for vulnerable people – staff qualification requirements (university degree, experience in domestic violence work) are proportionate to the nature of the service and do not restrict market entry, as shelters are not a competitive market but a publicly funded special service.

  29. Enacted 13 May 2015

    ⚠ SIMPLIFY596/2015

    Decree establishes a municipal economy and administration advisory committee (10–14 members + deputies) to review legislation and development plans concerning municipal finances and governance.

    The committee serves a legitimate coordination function between the state and municipalities. Problem: the committee can establish an unlimited number of subcommittees and invite external members without any cap, inflating the bureaucratic apparatus. 14 members + 14 deputies + subcommittee members = an estimated 40–60 people involved. The number and size of subcommittees should be capped in the decree. Core function is useful but the structure is too open-ended.

    Cost of the regulation~€250k/yrEstimated saving if simplified~€80k/yr
  30. Enacted 8 May 2015

    ⚠ SIMPLIFY588/2015

    Ministry of Agriculture decree setting detailed construction and functional requirements for publicly subsidized equestrian buildings (stables, open barns, riding arenas, outdoor fields).

    The decree contains extremely detailed millimeter-level construction specifications (stall dimensions, corridor widths, ventilation ppm limits, manure storage volumes, arena substrate layer thicknesses) that go well beyond what animal welfare law and the national building code already require. These over-specified technical norms as subsidy eligibility conditions raise investment costs and prevent innovative solutions. For example, arena substrate layers (250mm + 150mm + 100mm) and paddock surfaces (150mm + 100mm gravel) are rigid prescriptive norms with no performance-based alternative. The appendix tables contain approximately 40 separate dimensional requirements. Simplification: convert detailed prescriptive specifications to performance-based requirements, remove overlaps with the animal welfare regulation and building code, and set subsidy criteria based on animal welfare and safety outcomes only. Estimated savings in design costs of approximately €5,000–15,000 per project, around 50 projects/year = approximately €500,000/year.

    Cost of the regulation~€750k/yrEstimated saving if simplified~€500k/yr