The Ministry of the Environment decree sets the calculation method for a new building's climate report (carbon footprint and carbon handprint over 50 years) and the machine-readable building product list required for a building permit.
The EU directive (EU) 2024/1275 requires only a life-cycle GWP figure, but the decree adds as national requirements a five-part carbon handprint (ss. 14 to 19), a separate building-site calculation for every life-cycle stage (ss. 3 and 21), allocation across use classes (s. 22) and a separate building product list updated at final inspection (ss. 23 to 26); about 10,000 climate reports/yr x EUR 2,500 = an estimated EUR 25M/yr; fix: calculate only the directive's GWP for the building and drop the handprint, the separate site calculation and the product list, saving an estimated 10,000 x EUR 1,000 = EUR 10M/yr.