Ympäristöministeriön asetus purkumateriaali- ja rakennusjäteselvityksestä
Purpose
The decree requires a detailed demolition material and construction waste report categorized into 13 material classes when applying for building/demolition permits, and an update after project completion.
Analysis
The EU Waste Framework Directive target (70% recovery of construction/demolition waste) is justified, but requiring a 13-category breakdown at the permit stage – when quantities are mere estimates – is disproportionate. The post-completion update adds real value, but the permit-stage report doubles the work. Approximately 40,000 permit applications/year × 2–4 hours of consultant work × €80/h = €6.4–12.8M/year. Fix: require only 4–5 main categories (concrete, wood, metal, hazardous, other) at permit stage, and mandate the full 13-category breakdown only after completion based on actual transfer documents. This halves the permit-stage cost.