Valtioneuvoston asetus vesihuollosta
Purpose
Sets the content of municipal water services plans and of water utilities' asset management and preparedness plans, thresholds for significant disruptions, customer information and annual reporting to the national water services information system.
Analysis
Every water utility, including volunteer-run water cooperatives, must draw up an asset management plan with an investment and financing forecast for at least 20 years and review it every three years (s. 3), an 8-item preparedness plan (s. 4), and submit fee and financial data to the information system by the end of April each year (s. 9); the clause in s. 3 on taking the utility's size into account does not remove the duty. Cost: an estimated 1,100 small water cooperatives x 4 days/yr x EUR 500 = EUR 2.2M and 300 municipal utilities x 15 days/yr x EUR 800 = EUR 3.6M, totalling about EUR 5.8M/yr; the customer information in s. 7 follows the EU Drinking Water Directive and is left out of the fix. Fix: utilities serving under 1,000 residents fill in a combined asset and preparedness plan from a ready template and report to the information system every second year. Savings: about EUR 1.3M/yr.
Sources
Other environment laws
Analysis by Claude AI. Estimates are indicative.