Purpose

The Ministry of the Environment decree sets the data content of building design models, as-built models and special plans in IFC 4.3 format and the data municipalities must send on official building inspections to the built environment information system.

Analysis

Sections 3-4 require an IFC 4.3 model, or under section 5 machine-readable data, and annexes 1-5 list over a hundred attributes such as charging points, structured cabling, lift door openings and civil defence shelters, while sections 11-12 also require an as-built model or updated as-built data for the finished building; cost approx. 30,000 permit applications x EUR 500 for modelling and data = EUR 15M and 10,000 as-built models x EUR 1,000 = EUR 10M, total EUR 25M a year; fix: exempt detached houses and minor alterations from the as-built model, require as-built data only for parts that deviate from the approved design, and limit attributes to those the built environment information system uses; savings approx. 10,000 x EUR 700 = EUR 7M + 30,000 x EUR 100 = EUR 3M, total EUR 10M a year.

Sources

Other construction laws

Analysis by Claude AI. Estimates are indicative.

Send feedback

Tell us what went wrong or what you would like to see on the site.

What is it about?

Your message and the page address go to edgelord.tech, which runs the site. Page errors are reported there too.