✓ KEEP146/2018

Valtioneuvoston asetus eräistä vesialueelle sijoitettavista johdoista

2018· 2/22/2018· Construction
1/10
Growth friction
2/10
Complexity
2/10
Compliance cost
1/10
Simplification potential

Purpose

Decree regulates placement of water, sewer, power and telecom cables under rivers and streams via a notification procedure (not a permit procedure).

Analysis

The decree replaced a heavier permit procedure with a lighter notification procedure for placing cables under waterways – this is deregulation. Requirements are technically justified (cable protection, trench backfill, sewer tightness test, marking) and do not create excess bureaucracy.