Valtioneuvoston asetus uuden rakennuksen hiilijalanjäljen raja-arvoista
Purpose
The decree sets binding use-category limit values for the life-cycle carbon footprint of new buildings (e.g. apartment blocks 16.0 kgCO2e/m²/a in 2026–2028 and 12.0 from 2029), with limited permitted exceedances.
Analysis
The EU Energy Performance of Buildings Directive (2024/1275) only requires calculating and disclosing life-cycle GWP (large buildings 2028, all 2030) plus a roadmap for limits, yet Finland imposes binding limits from 9 Jan 2026 and tightens them by about 20–25% in 2029 (apartment blocks 800→600 kgCO2e/m²), raising costs for concrete and high-rise construction and adding a discretionary exceedance rule (§5 'particularly difficult', 'necessary') to permitting; cost approx. 5,000 buildings/yr × €4,000 design and verification = €20M/yr, plus material and structural cost after 2029; fix: keep calculation and disclosure (EU duty) but tie the introduction and level of limits to the common EU method and timetable (no earlier than 2030) and replace the §5 discretionary rules with a fixed percentage tolerance; savings approx. €15M/yr.
Sources
Other construction laws
Analysis by Claude AI. Estimates are indicative.